Investigate the surrounding environment and scaffolding before removing the scaf

2018-04-08 22:00:14
News details

1. Investigate the surrounding environment and scaffolding conditions before removing the scaffold, and make scaffold removal measures according to the requirements of technical disclosure and operating conditions, and clarify the division of labor.

2. When removing the scaffold, the operating area shall be designated, and the fence and warning signs shall be set up, and the special person shall be placed in custody.

3. The scaffold adjacent to the high voltage line shall be removed and the minimum safe distance shall be satisfied.

4, shelves of scaffolding dismantling and erection procedures, on the other hand, to build after the demolition, after the first open, should according to layer, according to step down the scaffolding demolition, to dismantle the protective column, scaffold board and wood, in accordance with the upper bound of bracing button again and jaw. The scaffolds shall be supported by a temporary diagonal brace before the scaffold is removed with all the scissor braces, pressure bars, and diagonal poles. It is strictly forbidden to remove the scaffold by pushing and pulling.

5. When the rod and the rod are removed, it must be coordinated by two or three people. When removing the water rod, the person standing in the middle will turn the pole, and the head will be turned down, holding the small head under the hand, and then letting go after the notice of the staff below.

6. The wall pole should be removed with the shelf layer by layer. Excessive deformation during the construction or even the wall shelf rod lack, uneven, should do before scaffolding dismantling necessary reinforcement or a temporary node, ensure the stability of scaffolding dismantling shelves.

7. Operators should wear safety belts and helmets. In the process of removing the scaffold, the personnel must be instructed and the operators must follow the instructions.

8. In the process of removing the scaffold, it should pay attention to the parts that are missing, broken and not meet the requirements. It is forbidden to step on the loose pole.

9. The scaffold materials should be shipped in time and sorted and stacked. The transport personnel must coordinate with the scaffold demolition crew.

10. When the scaffold is suspended, it is necessary to check the shelves of the unbroken parts in the work area and confirm the stability before leaving the site.